Use one French wording template for both supplier offers. Identify the equipment boundary and count the work at each interface. Ask the parties to write the accepted drawing revision beside any reservation.
Copy these labels into the scope record
| French field | Example wording for the supplier to confirm | Decision |
|---|---|---|
| Limites de fourniture | Du convoyeur de sortie de la remplisseuse à l’entrée de l’étiqueteuse | Name exact physical start and end |
| Interfaces mécaniques | Hauteur de transfert et sens de circulation à confirmer sur le plan révisé | Assign ownership of dimensions and drawing |
| Fourniture incluse / hors fourniture | Convoyeur inclus; câblage sur site à chiffrer séparément | Price excluded work on the same basis |
| Réserves | Essai du format de 750 mL à confirmer | Set responsible party and due date |
If the provider replies only “convoyeur compris”, ask which transfer, fittings and tasks that includes. Keep the drawing and exception list with the accepted scope.
Use the French used-line composition guide to identify modules missing from the scope record.